[vc_row padding_top=”0px” padding_bottom=”0px”][vc_column fade_animation_offset=”45px” width=”1/1″][/vc_column][/vc_row]
Lift Strut Attach Fitting (Video)
53-10-50 Lift Strut Attach Fitting Video In this video we go through the installation process of the lift strut attach fittings on the fuselage frame.
Seat Support Tubes (Video)
Seat Brace Tube Installation P/N 53-10-02-106 and P/N 53-10-02-107 Tube installation onto the fuselage frame.
53-50 Wings to Fuselage Fairing
53-50 Wing to Fuselage Fairing This is a one-off prototype wing to fuselage fairing that were making. We will update this once we get to the production aircraft. This will be the premise for the design for the production fairing that utilizes the BRS ballistic …
01-50 Tube Marking (Video)
Another episode of “Building the EMG-6”. In this episode we look at the process of marking tubing. Pretty much every component on the EMG 6 uses tubing for construction. In this video we show you how to accurately and easily mark tubing for these applications.
53 Fuselage
Builders Guide 53 Fuselage Builders Data Base Link To Fuselage 53-10 Fuselage 4130 Steel Frame 53-20 Fuselage Boom Assembly 53-30 Fuselage Components 53-31 Nose Skid 53-40 Keel Assembly 53-50 Wing To Fuselage Fairings 53-51 Forward Fuselage Fairings 53-60 Fuselage Aft (Fairings)
53-10-00.00 Wing Box Assembly
53-10-00.00 Wing Box Assembly Overview Builders Data Base Link to Wing Box Assembly Builders Data Base Link to Welding Fixtures Jig Components required to manufacture 53-10-00.00 Wing Box Welding Fixture. 53-10-00.01 Wing Box Base(1) 53-10-00.02 Wing Box Side (2) 53-10-00.03 Wing Box Center Spacer …
53-40 Keel
Builders Guide 53 Fuselage 53-40 Keel Builders Data Base Link to 53-40 Keel Assembly
Manufacturing the Keel Pockets (video)
53-10-08.100 Keel Pocket Another series and building the EMG-6. In this video we look at the process of manufacturing the keel pockets.
53-40-12 Lower Keel (Video)
53-40-12 Lower Keel Building the EMG-6: in this video we look at the installation of the fuselage lower keel assembly
53-40-11 Upper Keel (Video)
53-40-11 Upper Keel Building the EMG-6: in this video we show the installation procedures for the upper keel assembly
53-10-09-72 Passenger Rudder Pedal Tube Installation (Video)
Building The EMG-6 (53-10-09-72 Passenger Rudder Pedal Tube Installation) In this episode of building the EMG_6 We install the Passenger Rudder Pedal support tube for the fuselage frame
53-10-09-71 Seat To Gear Box Tube (Video)
Building The EMG-6 (53-10-09-71 Seat To Gear Box Tube) In this episode of building the EMG_6 We install the Seat To Gear Box tube for the fuselage frame
53-10-09.100 Brake Mount Tube (Video)
Building The EMG-6 (53-10-09.100 Brake Mount Tube) In this episode of building the EMG_6 We install the brake mount tube for the fuselage frame
53-10-05A Landing Gear Box Assembly (Video)
53-10-05A Landing Gear Box Assembly This is another episode in the Building The EMG-6 Series. In this episode we show how to attach the landing Gear Box to the rest of the fuselage frame.
53-10-06A Instrument Panel Instrument Panel Sub Assembly (Video)
53-10-06A Instrument Panel Instrument Panel Sub Assembly
- Page 1 of 2
- 1
- 2














