Builders Data Base
Tube Machining Files
Frame Fixture Files
Related Posts
Related Video
1
/
2


Wing Strut Attach Fitting (Building the EMG-6)
In this video we go through the installation process of the wing lift strut attach fittings. This is another video in the series of building videos for the EMG-6.

Seat Support Tubes (Building The EMG-6)
In this video we install the seat support tubes. P/N 53-10-02-106 Seat Brace and 53-10-02-107 Seat Brace Forward.

Tube Marking (Building the EMG-6)
Another episode of "Building the EMG-6". In this episode we look at the process of marking tubing. Pretty much every component on the EMG 6 uses tubing for construction. In this video we show you how to accurately and easily mark tubing for these applications.
Link to the Tube Marking Templates https://drive.google.com/folderview?id=0B6fcluqN5u3oUDI1R1BycExnYlE&usp=sharing

Manufacturing the Keel Pockets (Building the EMG-6) Rev 2
In this episode of building the EMG-6 we installed the lower half of the keel assembly.
Downloadable Template
http://www.electricmotorglider.com/Referance/02-07-00.PDF

Lower Keel Tube Installation (Building the EMG-6)
In this episode of building the EMG-6 we installed the lower half of the keel assembly.

Upper Keel Assembly Installation (Building the EMG 6)
In this episode of "Building the EMG-6" We position and weld in place the components necessary for the installation of the Upper Keel Assembly

Instrument Panel Bulkhead Installation (Building the EMG-6)
In this episode of Building the EMG-6 we take a quick look at the procedures for installing the Instrument Panel Bulkhead.

Building The EMG-6 (53-10-09-71 Seat To Gear Box Tube)
In this episode of building the EMG_6 We install the Seat To Gear Box tube for the fuselage frame

Building The EMG-6 (53-10-09-72 Pax Rudder Pedal Tube Installation)
In this episode of building the EMG_6 We install the Passenger Rudder Pedal support tube for the fuselage frame

Building The EMG-6 (53-10-09.100 Brake Mount Tube)
In this episode of building the EMG_6 We install the brake mount tube for the fuselage frame

Building The EMG-6 (Landing Gear Box)
This is another episode in the Building The EMG-6 Series. In this episode we show how to attach the landing Gear Box to the rest of the fuselage frame.

"Building The EMG-6" Instrument Panel Sub Assembly
"Building The EMG-6" Instrument Panel Sub Assembly

"Building The EMG-6" Tube Cutting Templates
"Building The EMG-6 Series"
Fuselage Frame Instrument Panel
marking and cutting Fuselage Frame tubing using the PDF Files and the tube templates.

Building the EMG-6 (Fuselage) Pilots Seat Transition Tubes
"Building The EMG-6"
(Fuselage)
(4130 Steel Frame)
(Pilots Seat)
Positioning and Installation of the Pilots Seat Transition Tubes

EMG-6 E-Drawings Now Availible
A Quick demonstration of what to expect from the e-drawings that are contained in the drawing package for the EMG-6
1
/
2
