27-41 Rudder Construction
This section is dedicated to the 27-41 Rudder Construction on the EMG-6. .
Links to Builders Data Base
[google-drive-embed url=”https://drive.google.com/embeddedfolderview?authuser=0&hl=en&id=0B6fcluqN5u3oVWxtTm5nRnNaZkE#list” title=”27-41 Rudder Assembly (LD)” icon=”https://drive-thirdparty.googleusercontent.com/16/type/application/vnd.google-apps.folder+shared” width=”100%” height=”400″ extra=”folder” style=”embed”]
Related Posts
Related You Tube Videos
Tube Marking (Building the EMG-6)
Another episode of "Building the EMG-6". In this episode we look at the process of marking tubing. Pretty much every component on the EMG 6 uses tubing for construction. In this video we show you how to accurately and easily mark tubing for these applications.
Link to the Tube Marking Templates https://drive.google.com/folderview?id=0B6fcluqN5u3oUDI1R1BycExnYlE&usp=sharing
Building The EMG-6 (Covering the Rudder Assembly LD)
A Time Lapse look at the covering of the rudder assembly with polyfiber 1.8 oz glider cloth.
Building The EMG-6 (27-41-00) Rudder Assembly (LD)
In this episode of building the EMG_6 We assemble the Rudder Assembly for the Low Drag Rudder.
Building The EMG-6 (27-41-00-10) Rudder Spar Sub Assembly
In this episode of building the EMG_6 We assemble the Rudder Spar Sub Assembly for the Low Drag Rudder assembly.



