Getting Started

Brian Carpenter · Rainbow Aviation

Getting Started

How to Get Started Building the EMG-6      Updated May 20, 2017

EMG-6 hangar photo

1  Follow the Project

Progress Blog (Shop Notes)

YouTube Channel

Subscribe

2 Join

Join The growing list of EMG-6 builders

By becoming a member you have access to all of the construction drawings that are currently available. Although all of the drawings on the builders database are currently open source, we will work directly with each of the builders to supply technical support and parts. In order to purchase parts for the EMG-6 you are required to have a builder serial number. The $500 is a very reasonable fee. It helps subsidize the enormous amount of effort put into the design and drawings that we post on the builders database. By becoming a platinum member the $500 fee for registration is waived.

EMG-6 hangar photo

Platinum Level Member

Platinum Level Pricing $5200 Deposit for Serial Number and a membership. 3% cash discount available. 100% of the deposit applies towards the purchase of parts or kit. This makes the serial number and membership free. Serial number is nonrefundable. Serial number is Transferable back to the Gold level with a $4500 deposit return to customer. Platinum level members have priority access to parts and customer support. This is the most cost-effective membership for those that are 100% sure that they are going to build and complete an aircraft.

EMG-6 hangar photo

Gold Level Member

Gold Level Pricing $500 for Serial Number and the membership. (S/N priority) Serial Number is nonrefundable. S/N is Transferable to Platinum Level registration for $4500 using a 3% cash discount available. This membership allows for the average builder to start building the project. this gold level membership allows for entry level cost with minimal risk while still building a substantial portion of the aircraft. It also allows the membership fee to be applied towards parts and materials should the builder elect to upgrade to the Platinum level.

EMG-6 hangar photo

Silver Level Member

3 Start Building

Fuselage Frame

EMG-6 hangar photo

Landing Gear

EMG-6 hangar photo

Fuselage Boom

EMG-6 hangar photo

Vertical Stabilizer

EMG-6 hangar photo

Rudder Assembly

EMG-6 hangar photo

Horizontal Stabilizer

EMG-6 hangar photo

Like the rudder assembly the horizontal stabilizer and elevator can be completed at any point in time, however they cannot be attached to the rest the aircraft until after completion of the fuselage boom and vertical stabilizer.

The ultralight version of the aircraft (UL) incorporates the use of a Dacron sailcloth type of construction.

The low drag ( LD) version of the aircraft incorporates the use of Poly Fiber type covering system (Dope and fabric).

Wings

EMG-6 hangar photo

The low drag ( LD) version of the aircraft incorporates the use of Poly Fiber type covering system (Dope and fabric).

The construction of the wings are fairly simple, but because of their size they are normally reserved for one of the last things that we will assemble on the aircraft.

Ailerons

EMG-6 hangar photo

Power Plant Package

EMG-6 hangar photo

Components

NOTES:

1. Limited Budget

2. Drawings and Builder Videos

3. Foreign Builders

4. Complete kits

5. Supply and Demand

6. Reality

7.Research and Development

8. Be Part of the Team