Advertisements
Latest Posts

April 2014

1st Welding Fixture Kits Ship

The 1st fuselage welding fixture kits begin shipping. 4-17-2014 In the picture below we see the box with all of the welding fixtures necessary to build the fuselage frame on the EMG-6. Although we [...]

April 17, 2014 // 0 Comments

Wing Box Welding Fixtures

Wing Box Frame and Jigging Fixtures April 2014 We have started the manufacturing of the fuselage frame for prototype #2 and #3. We have put a considerable amount of effort into designing this frame [...]

April 4, 2014 // 0 Comments